Maximum time at the workface.
Dosen prices the walking on a site before it is built: where the gate, canteen, drying rooms and toilets go, and what each layout costs in paid time.
3.5weeks for the moves to pay for themselves
Priced at a blended crew rate, less the cost of moving the three buildings.
minutes a day walking, per worker, on one worked layout of a 1,200-person site. Moving three buildings brought it to 23, and the moves paid for themselves in 3.5 weeks.
Illustrative project with invented figures.
What it does
One worker, one ordinary day
Gate to drying room, workface to canteen, the trips to the toilets. Every route is drawn on the plan and timed.
Scaled to the whole site
Multiply by the labour histogram and the walking becomes paid hours a week, at your blended rate.
Move a building, watch the money
Test where welfare, canteens and gates go. Each move is priced against the hours it hands back.
The gate, sized before the first morning
The shift start is modelled against turnstile lanes and drying-room places, so the queue is found on the drawing.
A break that is actually a break
Dosen counts how much of each break goes on walking to the canteen and back. Move the canteen and the rest goes up without adding a minute to the break.
Fewer crossings
Every walking route is checked against haul roads and plant routes, and the crossings are counted. Each layout change shows how many it removes.
Two ways to take the time back
The same crew finishing sooner, or the same programme with fewer people.
Sold as a study
Dosen is a piece of work with an answer at the end, not a licence.
Send the inputs
The site drawings, the labour histogram and your rates.
We model the layout you have
Every route, every trip, priced week by week.
You get the options, priced
Each move with its cost, its saving and its payback, and the working behind every figure.