Control Tower
The weekly meeting that builds itself.
The figures, the slides, the meeting and the minutes in one place. Built from your own pack, slide by slide.
LiveWith a tier-one main contractor in Ireland.
0of 43 slides built from this week's figures
The other 17 are the sections' own reports, dropped straight in.
hours a week went into building one weekly meeting pack by hand: spreadsheets, emails, PDFs and screenshots, retyped into slides.
Counted on one live project before the Control Tower.
What it does
Type it once
Paste the week's counts from the spreadsheet the site already keeps. A preview shows what is new before anything is saved, and every figure is kept with who entered it and when.
The sums are done for you
Car parks, buses, welfare and waste are worked out against the headcount, week by week. Toilets are checked against the statutory minimum and the site standard.
The slides build themselves
One number in, the chart draws itself, the slide builds itself. The sections' own reports drop straight in.
The meeting runs from one screen
Agenda, clock, actions and the pack together. Actions are logged live with an owner and a due week, and overdue ones stay in red until they are closed.
Minutes before the room empties
Attendance, decisions and actions are drafted as the meeting runs, then sent to everyone who was there.
Every job, one control view
Capacity, cost and programme across every live job, with each service's trigger point flagged before it runs out. Exported to your monthly report and Power BI.
How it starts
Nothing off the shelf. The Tower is built from the pack you already present.
Send last week's pack
The slides you present today and the spreadsheets behind them.
We rebuild it, slide by slide
Your layout, your headings, your figures.
Run one meeting from it
Side by side with the old pack until you trust it.