Clearway
The six-week look-ahead, put in order.
Every week each trade sends in what it is about to do, and someone retypes it onto a slide. Clearway replaces the slide with one live map that every trade fills in for itself.
In pilotWith a tier-one main contractor in Ireland.
Same footprint, same week. Both trades are told before the meeting.
A slide is a picture. Nothing in it is connected to anything else.
It cannot tell you that two lifts share a yard, that a date has already passed, or how much notice the rest of the site was given. A record can.
What it does
Each trade draws its own work
Where, when and what, entered once by the people doing it, on the site map, in the work weeks the site already talks in.
One map for the whole site
Crane lifts, road closures, deliveries and excavations in one picture, filtered by week, trade or kind of disruption.
Clashes show up before the meeting
Two works in the same place in the same week are flagged automatically, with both trades named.
Mistakes are stopped at the door
A date that has already passed is caught before saving. A pin in the wrong yard is moved by logistics, and the move is on the record.
Every change dated, named and kept
When a trade slips or access is not given, the record shows what was planned, what changed and who changed it.
One click publishes the week
The meeting pack is built from the plan and frozen as an edition. Next week's changes never rewrite it.
The right powers for each seat
Trades update their own work. Logistics resolves clashes and publishes. A client can be given a read-only view.
Where it runs
Hosted in the EU, or installed on your own servers where your IT team requires it.
How it starts
One meeting is enough to see the difference.
Load the site map
Your drawing, your areas and yards, your work-week calendar.
Trades submit one week
Each trade enters its own six weeks. It takes minutes.
Run the meeting from it
The clashes are already on the screen when people sit down.